­
  • Home
  • About Us
    • About Us
    • Skills, Knowledge, Experience and Behaviours (SKEB)
    • Customer Charter
    • Equality, Inclusion and Diversity
  • Projects
    • Residential
    • Educational
    • Healthcare
    • Commercial
    • Videos
    • Testimonials
    • Resident’s Experience
    • Chalcots Estate Camden
    • Wellington Close
    • Case Study Archive
  • Product & System
    • Our System
    • Product Range
    • System Performance
    • EWS1 Forms
    • Document Downloads
  • Procurement
    • Building Safety Act 2022
    • Procurement of Overcladding
    • How to deliver Hackitt
    • Carbon Reduction
    • Skills, Knowledge, Experience and Behaviours (SKEB)
  • News
    • Latest News
    • The Impact of Covid-19
  • Contact
Aluminium Rainscreen Overcladding Specialist
  • Home
  • About Us
    • About Us
    • Skills, Knowledge, Experience and Behaviours (SKEB)
    • Customer Charter
    • Equality, Inclusion and Diversity
  • Projects
    • Residential
    • Educational
    • Healthcare
    • Commercial
    • Videos
    • Testimonials
    • Resident’s Experience
    • Chalcots Estate Camden
    • Wellington Close
    • Case Study Archive
  • Product & System
    • Our System
    • Product Range
    • System Performance
    • EWS1 Forms
    • Document Downloads
  • Procurement
    • Building Safety Act 2022
    • Procurement of Overcladding
    • How to deliver Hackitt
    • Carbon Reduction
    • Skills, Knowledge, Experience and Behaviours (SKEB)
  • News
    • Latest News
    • The Impact of Covid-19
  • Contact
Building 29 <br src=

Building 29
University of Southampton

NON-COMBUSTIBLE

The works comprised insulated aluminium rainscreen and high-performance replacement windows. Additional works included new glazed screens and doors, entrance canopy, new gates and lightning protection. The University of Southampton’s Chemistry Department has an international reputation for excellence. This project was successfully delivered in an occupied building with no disruption to teaching or research throughout.

Client: University of Southampton
Reference: Darren Rattew MCIOB, Faculty Team Leader.
Building: Building 29
Contract Value: £2.1m
Project Duration: June 2019 to May 2020

View Case Study

Before

After

Before

After

Before

After

Related Works

  • Imperial College London, ACEX Building

    Imperial College London, ACEX Building

    Educational
  • Cledwyn Bridge Building Aberystwyth University

    Cledwyn Bridge Building
    Aberystwyth University

    Educational
  • North HertfordshireCollege, Block D

    North Hertfordshire
    College, Block D

    Educational
  • Rotherham College,Eastwood Building

    Rotherham College,
    Eastwood Building

    Educational

Get in touch

design build facades, The Packway, Larkhill,
Salisbury, SP4 8PY

Tel: 01980 654230

E-mail: mail@dbfacades.com

 

nqa-iso9001-ukas

Join us on social media

  • Twitter
  • Facebook
  • LinkedIn

Quick Links

  • Our SKEB
  • Procurement Framework
  • Delivering Hackitt
  • Videos
  • Covid-19 Impact
  • Document Downloads
  • Privacy Policy
Copyright 2025 design build facades.
Site Designed & Built by kf-d
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.Ok