Mulvaney Court,
Southsea

NON-COMBUSTIBLE

Fire safety works to modern multistorey building in Southsea, Portsmouth involving removal and replacement of extensive rendering and reconstructing brickwork areas. All works carried out whilst building with 64 flats was fully occupied.

Client: Abri Homes, Mark Sayer, Director of Safety & Resilience – Abri Group

Main Contractor: design build facades

Programme: March 2021 – September 2022

Contract Value: £1.7m

Building: Mulvaney Court

KEY OUTCOMES

  • Resident safety is assured with A2 – s1, d0 fire-rated cladding installed
  • Best value achieved by a solution with long-term integrity surpassing current standards
  • High-quality refurbishment that matches the original visual look of the building
  • Completed whilst fully occupied with minimum disruption to residents
  • Should the cladding no longer be required it is 100% recyclable.

During

After

During

After