Fire safety works to modern multistorey building in Southsea, Portsmouth involving removal and replacement of extensive rendering and reconstructing brickwork areas. All works carried out whilst building with 64 flats was fully occupied.
Mulvaney Court,
Southsea
NON-COMBUSTIBLE
Client: Abri Homes, Mark Sayer, Director of Safety & Resilience – Abri Group
Main Contractor: design build facades
Programme: March 2021 – September 2022
Contract Value: £1.7m
Building: Mulvaney Court
KEY OUTCOMES
- Resident safety is assured with A2 – s1, d0 fire-rated cladding installed
- Best value achieved by a solution with long-term integrity surpassing current standards
- High-quality refurbishment that matches the original visual look of the building
- Completed whilst fully occupied with minimum disruption to residents
- Should the cladding no longer be required it is 100% recyclable.