Park Reach

A1 NON-COMBUSTIBLE

Fire safety works, replacing existing cladding with A1 fire-safe cladding. Remove Kingspan K15 insulation and cavity barriers. Seal and retain windows, plus single drop of curtain wall. Refit new Rockwall insulation and Cavity barriers. Remove and replace Balcony Decking, and ancillary Works (re-fit + test LP system). All brickwork and brickwork insulation was also replaced.

Client: Abri
Procurement Method: Hyde Fire Safety Framework
Building: Park Reach
Project Duration: June 2022 – October 2023
Contract Value: £2.03m

  • Resident safety is assured with A1 fire-rated cladding installed
  • The best value achieved by a solution with long-term integrity surpassing current standards
  • High-quality refurbishment that matches the original visual look of the building
  • Completed whilst fully occupied with minimum disruption to residents
  • Should the cladding no longer be required it is 100% recyclable

Related Works