Posts Tagged:firesafetyworks

d+b facades is pleased to announce it has been awarded the contract to undertake fire-safety and recladding works to Mulvany Court, Portsmouth. The project on this occupied residential block comprises removing flammable high-pressure laminate (HPL) cladding and all flammable insulation, installing non-flammable insulation to all elevations, replacing the HPL with non-combustible aluminium cladding and re-installing
d+b facades is pleased to announce it is to undertake pre-construction works prior to refurbishing ‘K’ block, Harlow College. Building  ‘K’  is a  three-storey former  Secondary  School  Science Laboratory block,  constructed circa  1970’s.  The building’s appearance and character have become out–of-keeping with the majority of the College Campus following recent upgrades to the building stock